Sundown POA Project

  • Date: February 2010
  • Client: Sundown POA
  • Project Type: 8 Slip Boat Dock

About this Project

Location: H Highway, Lampe, MO

8 Slip dock

Accessories: Ramp gate, custom retractable decked-in section, swim stairs, twist bracket tables, sign frame.

sundown project
sundown poa
sundown poa
Construction: Fully welded galvanized steel substructure frames, galvanized steel columns, overhead and underwater bracing, concrete decking, composite boards for decked-in sections.

“…We chose Dry Docker because we felt that their quality of construction was excellent! We feel that several of their fabrication methods are designed for the rough water environment which should add to the longevity and stability of our dock…” Sundown POA

Related Projects

Dock Project

Sundown POA

Location: H Highway, Lampe, MO

8 Slip dock

Accessories: Ramp gate, custom retractable decked-in section, swim stairs, twist bracket tables, sign frame…

Boat Dock Project

Cape Fair Marina

Location: Cape Fair Marina

2 Slip fuel dock

Accessories: Platform for fuel dock, convenience store and custom utility cabinet/tool cabinet…

Boat Lift Project

Decked Lift

Location: Lampe, MO

Architect: Dry Docker, Inc.

Description: 6000lb boat lift which was modified for a 10.5’ x 16’ composite board deck to enjoy when…

Contact Us

3265 State Highway 13, Lampe, MO 65681

(417) 779-3700

Business Hours:

Monday through Friday - 8:00AM to 4:00PM

Saturday - Closed

Sunday - Closed